HOTEL AND LEISURE |
printable version |
![]() |
Shelbourne Hotel, Dublin
Architect: HKR Architects
Contractor: Michael McNamara & Co
KCC Architectural supplied and installed Steel Doors and Frames, Steel Frames, Fire Resistant Curtains, Ironmongery and Access Control Systems, Hotel Bedroom Entrance Systems to this prestigious 5* hotel in Dublins city centre.
02 Arena Dublin
Architect: HOK Sport Architecture, London
Management Contractor: Walls Construction
KCC Architectural supplied and installed Specialist Acoustic Doors, Steel Hinged Fire Doors and Fire Curtains to the project. The Acoustic Doors consisted of Vertically Lifting, Horizontal Sliding and Bi Parting Folding Doors some of which were 15m wide x 5m high. The doors were located around the stage area and provide the main entrance and exit points for equipment used during performances at the 02 Arena. Due to the size and complexity of the doors, significant structural supports had to be designed and installed into the building structure to carry and support the weight of the doors.







